Portfolio categories De-vegetation work

  • Runcorn
    • Date

       April 15, 2012

    • Client

       SSE – Generation Team

    • Task

       Carrying out regular visits to SSE 11kv distribution sites across the country and to clear all vegetation and chemic spray, leaving the site in a neat and tidy condition.

    • Category

       De-vegetation work, Home Nov 2016

  • Coed Darcey
    • Date

       April 15, 2012

    • Client

       SSE – Generation Team

    • Task

       Carrying out regular visits to SSE 11kv distribution sites in South Wales and to clear all vegetation and chemic spray, leaving the site in a neat and tidy condition.

    • Category

       De-vegetation work

  • Coventry
    • Date

       April 16, 2012

    • Client

       SSE – Generation Team

    • Task

       Carrying out regular visits to SSE 11kv distribution sites across the country and to clear all vegetation and chemic spray, leaving the site in a neat and tidy condition.

    • Category

       De-vegetation work

  • Carr Lane
    • Date

       April 16, 2012

    • Client

       SSE – Generation Team

    • Task

       This SSE electrical primary site had been untreated for approximately two years. Kraven Enterprises Ltd now visits this on a regular basis to clear all vegetation from the inner compound and around the outside of the perimeter fencing and chemic spray. This site is now looking in a neat and tidy condition.

    • Category

       De-vegetation work, Home Nov 2016

  • Chippenham

    This is a test excerpt

    • Date

       August 29, 2012

    • Client

       SSE – CHP Embedded Group

    • Task

       This SSE electrical site at Chippenham, Wiltshire had been untreated for a number of years. Very heavy dense vegetation (reaching over two metres in places) had grown at the rear of the site and on the approach way. Kraven Enterprises Ltd cleared and sprayed the heavy growth areas around the substation and in the inner compound. We now visit on a regular basis to clear all vegetation and leave this site in a neat and tidy condition.

    • Category

       De-vegetation work

  • Thamesmere

    test

    • Date

       August 15, 2013

    • Client

       SSE – Utility Solutions

    • Task

       This SSE electrical primary and 11kv distribution site at Thamesmere had been untreated for a number of years. Heavy weed growth, particularly buddleia, was present in the inner compound and in the surrounding area. The first visit took place in August 2013 with substantial work to cut back vegetation, clear away and chemic spray. The site is now visited on a regular basis and left in a neat and tidy condition.

    • Category

       De-vegetation work

  • Rail – Devegetation
    • Date

       March 17, 2013

    • Client

       Amey Rail

    • Task

       This contract, with Amey Rail CEFA Earthworks team, commenced in March 2013 and work was carried out in all Network Rail regions across England, Wales and Scotland. Teams of experienced clearance operatives visit hundreds of trackside sites, and clear de-vegetation strips at right angles to the railway and passages along boundary fences to allow Earthworks Engineers to carry out structural examinations. Kraven Enterprises Ltd has built up an excellent professional and reliable reputation over the past two years for this type of work.

    • Category

       De-vegetation work, Home Nov 2016

  • Rail – Hoghton Tower
    • Date

       May 17, 2013

    • Client

       Amey Rail

    • Task

       Working with Earthworks Engineers, this six day project included de-vegetation (inspection strips) along the boundary fence line and cut at right angles to the track. Some of this work took place under night-time possession. The project was completed on time and within budget – a hugely successful piece of work.

    • Category

       De-vegetation work